• English
  • العربية
  • বাংলা
  • Català
  • Čeština
  • Deutsch
  • Ελληνικά
  • Español
  • Suomi
  • Français
  • Gàidhlig
  • हिंदी
  • Magyar
  • Italiano
  • Қазақ
  • Latviešu
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Српски
  • Svenska
  • Türkçe
  • Yкраї́нська
  • Tiếng Việt
  • New user? Click here to register. Have you forgotten your password?
    Communities & Collections
    Self Submission
  • English
  • العربية
  • বাংলা
  • Català
  • Čeština
  • Deutsch
  • Ελληνικά
  • Español
  • Suomi
  • Français
  • Gàidhlig
  • हिंदी
  • Magyar
  • Italiano
  • Қазақ
  • Latviešu
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Српски
  • Svenska
  • Türkçe
  • Yкраї́нська
  • Tiếng Việt
  • New user? Click here to register. Have you forgotten your password?
MUST Repository
  1. Home
  2. Browse by Author

Browsing by Author "MGINA, CHARLES JOACHIM"

Now showing 1 - 1 of 1
  • Results Per Page
  • Sort Options
  • Loading...
    Thumbnail Image
    Item
    A STUDY ON EVALUATION OF HYDROPOWER POTENTIAL OF KAPOLOGWE WATERFALLS IN RUNGWE DISTRICT FOR RURAL ELECTRIFICATION
    (Journal of Research and Development, 2025-11-30) MGINA, CHARLES JOACHIM
    This study assessed the hydropower potential of the Kapologwe Waterfalls, situated on the Kala River, a tributary of the Kiwira River in Rungwe District, Mbeya Region, using an integrated methodology that combined spatial tools, field measurements, and socioeconomic surveys. Tools such as GPS, current meters, and automatic levels were used to gather geospatial and hydrological data, while structured questionnaires captured energy demand profiles from six villages within the catchment. The analysis incorporated topographic, climatic, land use, soil, and discharge data to characterise the river system. Diversity factor analysis was employed to estimate village-level energy needs, and Karl Pearson’s coefficient, along with the Weibull plotting technique, were used to validate hydrological correlations and construct a flow duration curve for the ungauged Kala River. Results indicate a hydropower potential of 7.237 MW, which falls short of the estimated 8.641 MW required to meet the aggregated four-year demand of all six villages. However, the identified potential is sufficient to meet the current demand (7.116 MW) of five villages, making the site viable for phased electrification. The study concludes that the Kapologwe Waterfalls offer a technically feasible solution for decentralised power generation in the Kala catchment. However, to meet long-term and inclusive demand, it is recommended that this resource be supplemented with additional energy sources, such as support from the Rural Energy Agency (REA). Furthermore, future research should focus on optimising turbine design for high-head, low-flow conditions to improve system efficiency, minimize maintenance needs, and extend equipment lifespan.
Other Links
  • Government portal
  • Ministry of Education
  • TCU
  • Free E-Journals
  • Tz Newspapers Online
  • Open Access Resources – INASP
useful resources
  • Emerald Database
  • Taylor & Francis
  • EBSCO Host
  • Research4Life
  • Elsevier Journal
Contact us
  • Mbeya University of Science and Technology.
    P.O. Box 131,
    Mbeya,
    Tanzania.
    Phone: +255 25 295 7544
    must@must.ac.tz

MUST copyright © 2002-2026

  • Privacy policy
  • End User Agreement
  • Send Feedback