• English
  • العربية
  • বাংলা
  • Català
  • Čeština
  • Deutsch
  • Ελληνικά
  • Español
  • Suomi
  • Français
  • Gàidhlig
  • हिंदी
  • Magyar
  • Italiano
  • Қазақ
  • Latviešu
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Српски
  • Svenska
  • Türkçe
  • Yкраї́нська
  • Tiếng Việt
  • New user? Click here to register. Have you forgotten your password?
    Communities & Collections
    Self Submission
  • English
  • العربية
  • বাংলা
  • Català
  • Čeština
  • Deutsch
  • Ελληνικά
  • Español
  • Suomi
  • Français
  • Gàidhlig
  • हिंदी
  • Magyar
  • Italiano
  • Қазақ
  • Latviešu
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Српски
  • Svenska
  • Türkçe
  • Yкраї́нська
  • Tiếng Việt
  • New user? Click here to register. Have you forgotten your password?
MUST Repository
  1. Home
  2. Browse by Author

Browsing by Author "Mbwiga, Joel"

Now showing 1 - 1 of 1
  • Results Per Page
  • Sort Options
  • Loading...
    Thumbnail Image
    Item
    Feasibility Assessment of a 5 MW Run-of-River Mini-Hydropower Plant on the Luswisi River at Bwenda Village, Ileje District, Tanzania
    (EASO, 2026-08-26) Bigambo, James; Mbwiga, Joel; Kamoleka, Masoud
    This study assesses the technical and screening-level economic feasibility ofa 5 MW high-head run-of-river mini-hydropower plant on the Luswisi Riverat Bwenda Village, Ileje District, Tanzania. The revised paper integrates thetopographic survey, HOMER Pro model configuration and outputs, andMATLAB/Simulink dynamic-simulation results that were omitted from the earlier manuscript. The site is located at approximately 9°20.1′S and 33°29.4′E. GIS-based catchment delineation and RTK-GNSS/total-stationsurvey data identify the intake, waterway and powerhouse corridor andestablish a gross head of 153 m; a preliminary 5% hydraulic-loss allowancegives a net head of 145.35 m. Corrected monthly discharge ranges from 3.70 to 7.10 m³/s. At 90% combined efficiency, 5 MW requires approximately 3.70m³/s at gross head and 3.90 m³/s at the preliminary net head. The HOMER Prohydro-grid model uses the corrected monthly flow vector, a 5 MW hydro unit,local AC demand, grid backup/export, a 25-year project life, an 8% discountrate, TZS 18 billion capital cost, TZS 2 billion lifetime operation and maintenance cost, and TZS 168/kWh electricity value. The correctedscreening analysis gives 41,062 MWh/year saleable energy, an LCOE of about TZS 43.0/kWh, NPV of TZS 54.8 billion, IRR of 37.9%, and simplepayback of 2.6 years. MATLAB/Simulink results show damped transientbehaviour: frequency returns to approximately 50 Hz, rotor speed convergestoward 1.0 pu, torque and active/reactive power remain bounded, balancedthree-phase voltages are maintained, the local load is supplied, and surplus active power is transferred to the grid interface. These results supportfeasibility-level development of two 2.5 MW Pelton units, subject to multi-year gauging, detailed hydraulic and geotechnical design, environmental-flowallocation, manufacturer data and utility interconnection approval.
Other Links
  • Government portal
  • Ministry of Education
  • TCU
  • Free E-Journals
  • Tz Newspapers Online
  • Open Access Resources – INASP
useful resources
  • Emerald Database
  • Taylor & Francis
  • EBSCO Host
  • Research4Life
  • Elsevier Journal
Contact us
  • Mbeya University of Science and Technology.
    P.O. Box 131,
    Mbeya,
    Tanzania.
    Phone: +255 25 295 7544
    must@must.ac.tz

MUST copyright © 2002-2026

  • Privacy policy
  • End User Agreement
  • Send Feedback