Evaluation of Hydropower Potential of Kapologwe Waterfalls for Rural Electrification in Rungwe District, Mbeya Region Tanzania.

dc.contributor.authorMgina, Charles J.
dc.contributor.authorKatambara, Zacharia
dc.date.accessioned2025-01-22T09:23:44Z
dc.date.available2025-01-22T09:23:44Z
dc.date.issued2024-12-05
dc.descriptionThis Journal Article of Engineering and Technology was Published by MUST Journal of Research and Development (MJRD).
dc.description.abstractHydropower remains one of the most significant renewable energy sources, accounting for a substantial proportion of global electricity production. In Tanzania, where electricity access is limited, particularly in rural areas, untapped hydropower resources could play a critical role in meeting local energy needs. This study investigates the hydropower potential of the Kapologwe Waterfalls on the Kala River, located in Rungwe District, Mbeya Region. Key factors influencing hydropower generation, including hydraulic head, flow rate, and turbine efficiency, were analyzed using land survey techniques and hydrological modeling. The hydraulic head was measured at 605.15 meters, and flow rates were calculated based on field data, with a design flow of 1.542 m³/s. A Pelton turbine, known for its high efficiency under high-head, low-flow conditions, was selected for the site. The estimated power potential is 7.238 MW, suggesting that the Kapologwe Waterfalls could significantly contribute to localized electrification and reduce reliance on Tanzania’s national grid. This research highlights the feasibility of small-scale hydropower projects in rural Tanzania and their potential to alleviate energy poverty.
dc.description.sponsorshipMbeya University of Science and Technology.
dc.identifier.issn2683-6475
dc.identifier.urihttps://doi.org/10.62277/mjrd2024v5i40064
dc.identifier.urihttps://repository.must.ac.tz/handle/123456789/213
dc.language.isoen
dc.publisherMJRD
dc.titleEvaluation of Hydropower Potential of Kapologwe Waterfalls for Rural Electrification in Rungwe District, Mbeya Region Tanzania.
dc.typeArticle
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
MJRD-5-4-0064.pdf
Size:
595.32 KB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description:
Collections